All extensions

EA Value Tracker

2399 EUR / yearv1.9.4

value-creation

Every EA function eventually faces the same question from the CFO or CIO: "How much value does our Enterprise Architecture function creates ?" Roadmaps and diagrams don't answer it — numbers do. EA Value Tracker turns Turbo EA's Architecture Decision Records into an auditable financial ledger of the value your EA practice creates, so the answer is one dashboard, not a scramble through spreadsheets before the budget review.

Value is claimed where it originates: on the decision. While an ADR is being drafted, architects attach categorized savings claims — hard savings, soft savings, cost avoidance, revenue enablement, risk avoidance — each with an amount in your workspace currency, a fiscal year, a one-time or annual run-rate classification, and the people responsible. When the decision is signed, the claims are approved and frozen with it: the figures your signatories endorsed can never drift afterwards (changing them takes a formal revision), which is exactly the property a finance audience expects.

Claiming is a forecast; EA Value Tracker also tracks what actually happened. Against each approved claim, realized value is recorded and approved four-eyes: the recorder designates a different person as approver, only that person can approve or reject the figure, the decision lands as a to-do on their list, and every rejection and correction is kept for audit. The result is a clean claimed-to-realized funnel — Claimed (draft) → Claimed (approved) → Realized (pending) → Realized (approved) — that distinguishes what architecture promised from what it verifiably delivered.

The EA Value Tracker dashboard under Reports rolls it all up for the executive conversation: KPI tiles (verified value, all-time, run-rate, drafts, contributing decisions), a category breakdown, value per responsible person, and a multi-year fiscal trend — all scoped to a fiscal year of your choice and switchable between the claims and realized basis. A per-entry ledger links every number back to the decision that produced it, the decisions grids gain native Claimed, Realized, and Approver columns, and the whole dashboard exports to PowerPoint for the steering committee.

Requires Turbo EA ≥ 2.14.0. Value data is stored in your instance, survives updates and license changes, and is never deleted.

EA Value Tracker screenshot 1EA Value Tracker screenshot 2EA Value Tracker screenshot 3EA Value Tracker screenshot 4EA Value Tracker screenshot 5
Strategy, Planning & TransformationCommercialTry free for 30 days — no credit card

What’s new

1.9.42026-09-05

Added
  • This extension now ships a changelog. Every release from here on documents what changed for you in this file, and it travels inside the signed bundle so it is on disk wherever the extension is installed.

1.9.32026-08-26

Added
  • The extension carries its own logo, so it is recognisable on the Store and Installed tabs rather than showing a generated tile.

1.9.22026-08-20

Added
  • A full description, screenshots and topical tags on the store listing.

1.9.12026-07-14

Changed
  • The realization card is tinted light blue rather than green — green read as "this is done" on a card that is only recording a claim.

1.9.02026-07-14

Added
  • A header button and stage chips on the decision record, so where a saving stands is visible without scrolling.
Changed
  • Wider dashboard grid columns, and a tinted realization card.

1.8.02026-07-14

Changed
  • Realization moved below the signatures on the decision record — it is what happens after the decision, not part of it — with a jump link in the header. It is deliberately left out of the exported document, which captures the decision as signed.

1.7.02026-07-13

Added
  • The dashboard keeps its filters and selection across a page refresh, like a core report.

1.6.12026-07-13

Changed
  • The decisions-grid columns say what they hold instead of carrying generic names.

1.6.02026-07-13

Changed
  • "Approved" now says which kind of approved it means — a claim that was approved, or a saving that was realized — everywhere the word appears. The two were indistinguishable.

1.5.02026-07-13

Added
  • The dashboard can be saved as a report with a thumbnail, alongside core's saved reports.

1.4.32026-07-13

Fixed
  • A large total no longer overflows the middle of the donut chart.

1.4.22026-07-13

Removed
  • The Realization rate tile. It divided two numbers that are counted at different times, so it read as precision the data does not have.

1.4.12026-07-13

Changed
  • The workflow trail gets its own line, and Record is offered only where nothing has been recorded yet.

1.4.02026-07-13

Changed
  • A workflow trail replaces the single status pill — claimed, approved, realized, and who did each, rather than one word for all of it.

1.3.02026-07-13

Added
  • The designated approver gets a todo, and Record sits inside the Realized column where the work actually happens.

1.2.02026-07-13

Added
  • A designated approver per saving, so four-eyes approval names a person rather than a role.

1.1.02026-07-13

Added
  • The claimed-to-realized funnel with four-eyes approval. A saving is claimed on a decision, approved by someone other than the claimant, and later recorded as realized — and the dashboard shows the drop-off at each step.

1.0.52026-07-13

Fixed
  • The table in the decision-record panel no longer overflows its container.

1.0.42026-07-13

Added
  • Multi-slide PowerPoint export of the dashboard, and a Savings column on the decisions grid.

1.0.32026-07-13

Changed
  • The dashboard is scoped to a fiscal year and redrawn in core's card style.

1.0.22026-07-13

Changed
  • The first funnel stage is called Draft rather than Pipeline.

1.0.02026-07-12

Added
  • First release. Record the savings a decision claims, track them to realization, and see the portfolio on a dashboard — with a panel on the decision record itself, a column on the decisions grid, and a section in the exported document.
Back to the store